Flightcase Blog

Replacement values: the field everyone skips and later regrets

Replacement value drives your rate card, your insurance schedule and every loss conversation. Here is how to set it and keep it current.

Operations Published Sep 6, 2026 6 min read
replacement value equipment insurance schedule rental inventory value AV inventory control
In this article

Three things depend on this one number

Replacement value is the least interesting field in an inventory record and it quietly controls three separate conversations.

  • Your rate card, if you price from a percentage of replacement value.
  • Your insurance schedule, which is only as good as the values you declared.
  • Every loss and damage conversation with a client, an insurer or a subrental vendor.

It is replacement cost, not what you paid

The number you want is what it would cost to put an equivalent item back on the shelf today, including the tax and freight you would actually pay. It is not the price on the original invoice, and it is not the depreciated book value your accountant carries.

Those three numbers diverge badly over time, and in different directions. A fixture bought six years ago may cost more to replace than you paid, while a camera body from the same year may cost a fraction. Working from the purchase price gets both wrong.

What to do when the item is discontinued

Plenty of working gear is no longer made. The practical answer is the cost of the nearest current equivalent that would let you do the same job, not the price of a used unit on a marketplace.

This matters at exactly the wrong moment. If a case goes missing the week before a show, what you need is the cost of getting a working replacement in time, and that is closer to the current-equivalent price than to a second-hand listing.

Fill it in while you are already in the record

This is the entire practical lesson. Adding replacement values while you are creating or importing an item costs a few seconds each. Going back to do it later means opening several hundred records one at a time, and it is the job every rental company postpones indefinitely.

If you are importing a catalog from a spreadsheet, put the values in the spreadsheet before the import rather than after.

Cases should roll up

A case is worth what is in it. If your system values a case at the cost of the empty case, your insurance schedule is understated by however much gear is inside, which is usually most of the value.

Flightcase rolls case value up from contents, so a case reports what it would actually cost to replace rather than what the shell cost.

Review them, and put a date on it

Replacement values drift with the market. A yearly pass over the highest-value categories catches most of the drift for a modest amount of work, and it gives you something defensible to hand an insurer.

None of this is insurance or tax advice. How your policy values a loss, and what your accountant does with depreciation, are questions for the people who carry that professional responsibility. What this post covers is keeping the operational number accurate enough to be worth using.

FAQ

Is replacement value the same as what I paid for the item?
No. Replacement value is what an equivalent item would cost to put back on the shelf today, including tax and freight. The purchase price and the depreciated book value are different numbers that diverge over time, sometimes upward and sometimes downward depending on the category.
What replacement value do I use for discontinued gear?
The cost of the nearest current equivalent that would do the same job. A used marketplace listing is not a reliable basis, because what you actually need when something goes missing is a working replacement available in time.
How should cases be valued?
By their contents. A case valued at the cost of the empty shell understates your insurance schedule by most of what is inside it. Systems that roll case value up from contents avoid that automatically.
How often should replacement values be reviewed?
Once a year over the highest-value categories catches most of the market drift without becoming a project. A rolling review by department is more likely to actually happen than an annual full rebuild.

Put this into the system you actually run on

Rates, replacement values, deposits and subrental costs are only useful when they live where the quote is built. Start free, or bring a real job to a walkthrough.

Book a walkthrough